Excavator Walking hydraulic foot pedal
Product Specifications
Product Model | Excavator walking hydraulic foot pedal |
Maximum import pressure | 6.9MPa |
Maximum back pressure | 0.3MPa |
Flow rate | 10L/min |
Working oil temperature | - 20C~90C |
cleanliness | NAS level 9 or below |
Product Features
Easy To Operate: The excavator is operated by foot pedal, and the operator only needs to step on the pedal to control the forward and backward movements of the excavator.
High Reliability: Hydraulic foot valves are usually made of high-quality materials and manufacturing processes, with good sealing and durability, and can withstand long-term and heavy load use.
Accurate Control: This foot valve has been carefully designed and calibrated to provide accurate and stable flow and pressure control, ensuring the stability and controllability of excavator walking.
Strong Safety: Foot valves are usually equipped with protective devices to prevent accidental operation, such as locking mechanisms or safety switches, to ensure the safety of operators during use.
Application
FPP-J8-X2 excavator walking foot valve for excavators such as Sany, XCMG, and LGMG.
FPP-D8-X1 excavator walking foot valve for excavators such as Carter.
The selection of hydraulic foot valve for excavator walking should be determined based on the specific model and working requirements of the excavator. During installation and use, it is necessary to carry out reasonable installation and debugging in accordance with relevant technical requirements and operating manuals, and regularly maintain and repair to ensure the normal operation and service life of the valve.
Products Display
FPP-D8-X1
FPP-J8-X2
WHY CHOOSE US
How we work
Development (tell us your machine model or design)
Quotation (we will provide you with a quotation as soon as possible)
Samples (samples will be sent to you for quality inspection)
Order (placed after confirming quantity and delivery time, etc.)
Design (for your product)
Production (producing goods according to customer requirements)
QC (Our QC team will inspect the products and provide QC reports)
Loading (loading ready-made inventory into customer containers)
Our Certificate
Quality Control
To ensure the quality of factory products,we introduce advanced cleaning and component testing instruments, 100% of the assembled products pass factory testing and the test data of each product is saved on a computer server.
R&D team
Our R&D team consists of 10-20 people, most of whom have about 10 years of work experience.
Our R&D center has a sound R&D process,including customer survey, competitor research, and market development management system.
We have mature R&D equipment including design calculations, host system simulation, hydraulic system simulation, on-site debugging, product testing center, and structural finite element analysis.
-
FPP-D8-X1 Drawing
-
FPP-J8-X2 Drawing