30AY-08 Hydraulic control check valve
Product Features
1. Hardened seat for long life and low leakage.
2. Optional sealed piston.
3. Optional spring ranges.
4. Compact size.
Product Specifications
Product Model | 30AY-08 Hydraulic control check valve |
Operating Pressure | 240 bar (3500 psi) |
Flow | See Performance Chart |
Internal Leakage 240 bar (3500 psi) | ③ to ② : 0.25 ml/min. max (2 drops/minute) ② to ① without sealed piston: 115 ml/min. max (7 cu. in./minute) ② to ① with sealed piston: Zero leakage |
Pilot Ratio | 3 : 1 |
Check Spring Bias | 1.72 bar (25 psi), Standard |
With Sealed Piston Option | 6.2 bar (90 psi) minimum |
Temperature | -40°℃~120°C |
Fluids | Mineral-based or synthetics with lubricating properties at viscosities of 7.4 to 420 cSt (50 to 2000 ssu).Installation:No restrictions |
Cartridge | Weight: 0.08kg. (0.18 lbs.); Steel with hardened work surfaces. Zinc-plated exposed surfaces. Seal: D type seal ring. |
Standard Ported Body | Weight: 0.27 kg. (0.60 lbs.); Anodized highstrength 6061 T6 aluminum alloy, rated to 240 bar (3500 psi). Ductile iron and steel bodies available; dimensions may differ. |
Product Operation Symbol

The 30AY-08 allows flow from ②to ③, while normally blocking flow from ③ to②. The flflow will be allowed from ③ to ② when sufficient pressure is applied at ①. The cartridge has a 3:1 pilot ratio, meaning that at least one-third of the load pressure held at ③ is required at ① to open the valve. The check is spring-biased to assure holding in static or no-load conditions. A sealed pilot piston option is available.
Performance/Dimension


WHY CHOOSE US
How we work
Development (tell us your machine model or design)
Quotation (we will provide you with a quotation as soon as possible)
Samples (samples will be sent to you for quality inspection)
Order (placed after confirming quantity and delivery time, etc.)
Design (for your product)
Production (producing goods according to customer requirements)
QC (Our QC team will inspect the products and provide QC reports)
Loading (loading ready-made inventory into customer containers)

Our Certificate



Quality Control
To ensure the quality of factory products,we introduce advanced cleaning and component testing instruments, 100% of the assembled products pass factory testing and the test data of each product is saved on a computer server.












R&D team

Our R&D team consists of 10-20 people, most of whom have about 10 years of work experience.
Our R&D center has a sound R&D process,including customer survey, competitor research, and market development management system.
We have mature R&D equipment including design calculations, host system simulation, hydraulic system simulation, on-site debugging, product testing center, and structural finite element analysis.