24DH-B08 2-position 4-way electric valve change

The 24DH-B08 2-position 4-way electric valve change is a durable spool valve designed for reliable fluid control in demanding industrial applications. With its 4-way and 2-position functionality, it provides accurate management of the fluid flow direction. This component is suitable for high-pressure environments, making it ideal for challenging conditions.


Product Detail

Product Tags

Product Features

1. Continuous-duty rated coil.
2. Hardened seat for long life and low leakage.
3. Optional coil voltages and terminations.
4. All ports may be fully pressurized.
5. Heavy-duty waterproof E-Coils rated up to IP69K

Product Specifications

Product Model 24DH-B08 2-position 4-way electric valve change
Operating Pressure 350 bar (5100 psi)
Internal Leakage 82 ml/min. max. at 210 bar (5075 psi)
Flow 30L/min(8 gpm)
Temperature -40°℃~100°C
Response Time Pull-In: 150 msec.; Drop-Out: 150 msec
Fluids Mineral-based or synthetics with lubricating properties at viscosities of 7.4 to 420 cSt (50 to 2000 ssu).
Installation No restrictions
Cartridge 0.23 kg. (0.51 lbs.); Steel with hardened work surfaces. Zinc-plated exposed surfaces.
Seal D type seal rings

Product Operation Symbol

poppet-2-way-nc-valve

When de-energized, the 24DH-B08 flow paths are ② to ① and ③ to ④.When energized, the cartridge’s spool shifts to open ③ to ② and ④ to①.

Performance/Dimension

solenoid-coil
solenoid-circuit

WHY CHOOSE US

EXPERIENCED

We have more than 15 years of experience in this item.

OEM/ODM

We can produce as your request.

HIGH QUALITY

Introduce well-known brand processing equipment and provide QC reports.

FAST DELIVERY

3-4 weeks delivery in bulk

GOOD SERVICE

Have a professional service team to provide one-to-one service.

COMPETITIVE PRICE

We can provide you best price.

How we work

Development (tell us your machine model or design)
Quotation (we will provide you with a quotation as soon as possible)
Samples (samples will be sent to you for quality inspection)
Order (placed after confirming quantity and delivery time, etc.)
Design (for your product)
Production (producing goods according to customer requirements)
QC (Our QC team will inspect the products and provide QC reports)
Loading (loading ready-made inventory into customer containers)

Production Process

Our Certificate

category06
category04
category02

Quality Control

To ensure the quality of factory products,we introduce advanced cleaning and component testing instruments, 100% of the assembled products pass factory testing and the test data of each product is saved on a computer server.

equipment1
equipment7
equipment3
equipment9
equipment5
equipment11
equipment2
equipment8
equipment6
equipment10
equipment4
equipment12

R&D team

R&D team

Our R&D team consists of 10-20 people, most of whom have about 10 years of work experience.

Our R&D center has a sound R&D process,including customer survey, competitor research, and market development management system.

We have mature R&D equipment including design calculations, host system simulation, hydraulic system simulation, on-site debugging, product testing center, and structural finite element analysis.


  • Previous:
  • Next: