Hydraulic control reversing valve IPD10-41 b
Product Features
1. Hardened spool and cage for long life.
2. Industry common cavity
Product Specifications
Product Model | Hydraulic control reversing valve IPD10-41 b |
Operating Pressure | 240 bar(3500 psi) |
Proof Pressure | 350 bar(5100 psi) |
Flow | See Performance Chart |
Internal Leakage | 82 ml/min. max (5 cu. in./minute) at 207 bar (3000 psi) |
Pilot Pressure Required | To Spool Crossover: 4.1 bar (60 psi) Spring:4.7 bar(68.2 psi);7.6 bar (110 psi) Spring:7.6 bar(110 psi).To Full Spool Shift:4.1 bar (60 psi) Spring: 5.2 bar (75 psi);7.6 bar (110 psi) Spring: 8.6 bar (125 psi) |
Oil Volume Required to Full Shift | 0.65 ml (0.04 cu. in.) |
Temperature | -40°℃~100°C |
Fluids | Mineral-based or synthetics with lubricating properties at viscosities of 7.4 to 420 cSt (50 to 2000 ssu). |
Installation | No restrictions |
Cartridge | Weight: 0.16kg. (0.35 lbs.); Steel with hardened work surfaces. Zinc-plated exposed surfaces |
Seal | D type seal ring. |
Standard Ported Body | Weight: 0.34 kg. (0.75 lbs.); Anodized high-strength 6061 T6 aluminum alloy, rated to 240 bar (3500 psi). |
Product Operation Symbol

In a neutral position (unpiloted), the Hydraulic control reversing valve IPD10-41 b allows flow from ③ to ② bidirectionally, while the flow is blocked at ④. On remote pilot signal at ①, the valve shifts to open from ③ to ④, while blocking flow to ②. Since ④ is connected to the spring chamber, pressure on ④ will directly (1:1) affect the pilot pressure required, and must always be added to the bias spring value.
Note: Consult Inno for applications where bi-directional flow is required when the valve is in the normal or spring-offset
Performance/Dimension


WHY CHOOSE US
How we work
Development (tell us your machine model or design)
Quotation (we will provide you with a quotation as soon as possible)
Samples (samples will be sent to you for quality inspection)
Order (placed after confirming quantity and delivery time, etc.)
Design (for your product)
Production (producing goods according to customer requirements)
QC (Our QC team will inspect the products and provide QC reports)
Loading (loading ready-made inventory into customer containers)

Our Certificate



Quality Control
To ensure the quality of factory products,we introduce advanced cleaning and component testing instruments, 100% of the assembled products pass factory testing and the test data of each product is saved on a computer server.












R&D team

Our R&D team consists of 10-20 people, most of whom have about 10 years of work experience.
Our R&D center has a sound R&D process,including customer survey, competitor research, and market development management system.
We have mature R&D equipment including design calculations, host system simulation, hydraulic system simulation, on-site debugging, product testing center, and structural finite element analysis.